Supplementary Provisions on the Shaanxi Electric Power Design Institute Cup Bridge Competition
Source:
|
Author:proa20e56
|
Published time: 2019-05-29
|
375 Views
|
Share:
Supplementary Provisions on the Shaanxi Electric Power Design Institute Cup Bridge Competition.
Supplementary Provisions on the Shaanxi Electric Power Design Institute Cup Bridge Competition
2007-09-26
Shaanxi Bridge Association
Due to major event arrangements, the schedule for the original October 1st to October 4th was adjusted and the following additional provisions were made for the competition regulations:
1. Competition method
Open team competition
Using the Swiss shift system, a total of nine rounds of competition, playing 16 decks per round, to determine the rankings in total, no longer in the finals and re-match.
2. Open doubles
According to the registration situation, the Mitchell double championship system is adopted.
II. Schedule
October 1
Morning: 9.00-9.30 Opening Ceremony
9.30-11.30 The first round of the Swiss shift system
Afternoon: 12.30-14.30 Swiss shift system second round
14.40-16.40 Swiss shift system third round
16.50-18.50 Swiss shift system fourth round
October 2
Morning: 9.30-11.30 Swiss shift system fifth round
Afternoon: 12.30-14.30 The sixth round of the Swiss shift system
14.40-16.40 Swiss shift system seventh round
16.50-18.50 The eighth round of the Swiss shift system
October 3
Morning: 9.00-11.00 Swiss shift system ninth round
11.00-11.30 Closing ceremony
Afternoon: 13.00-17.00 Doubles / Invitational
3. Competition discipline:
1. It is strictly forbidden to use mobile phones in the stadium. If there is a mobile phone ringing, the relevant team 2VP will pick up the phone and cancel the qualification of the team.
2, speaking of civility and courtesy, entering the stadium is neatly dressed.
3. The players on the field are not allowed to watch the game of the team.
4. When the contestant leaves the position, he must obtain the consent of the referee or go with the same table.
5. No smoking is allowed in the stadium.
Shaanxi Electric Power Design Institute
Shaanxi Bridge Association
September 25, 2007